ONEZA Construction builds workshops, class A and B warehouses and logistics centres in Georgia from 1,000 m² and up to 14 m clear height in 6–12 months. 2026 guide: monolithic frame from $140 / m², ready for fit-out with utilities from $300 / m². The duration of every stage is fixed in the contract.

Commissioning goes in phases: the first phase runs while the second is being built. ONEZA plans from the production flow and calculates floors and slabs for the actual equipment and vehicles. The building is handed over ready for equipment — with floors, ramps, power supply, ventilation and treatment facilities. Payment: 100% of the materials and 15% of the work up front, then against the acts of accepted stages.

Your challenge

How to start production
before construction ends?

The problem

Every month of downtime is lost revenue. A delayed build pushes back the production launch and breaks contracts.

The ONEZA answer

Phased commissioning: the first phase operates while the second is being built. The deadline for each phase is fixed in the contract.

Specifics

Which warehouses and workshops
does ONEZA build?

Format
Production halls, Class A and B warehouses, logistics centres, power units
Floor area
from 1,000 m²
Height
up to 14 m, crane rails
Structure
Monolithic or precast-monolithic frame
Completion stage
Equipment-ready: floors, utilities, loading ramps
Schedule
6–12 months

What makes this segment different

What do we consider
when building a warehouse?

Process flow

We design the layout around your production process flow.

Loads

Floors and slabs engineered for your actual equipment and vehicles.

Power

Power supply, ventilation and wastewater treatment included in the design.

Launch

We assist with commissioning and utility connections.

Price

How much does
a warehouse cost per m²?

Indicative 2026 prices for Tbilisi: materials and labour included, design and permits excluded. The exact price is fixed in the contract after the design stage.

StageFrameFacade and windowsUtilitiesPrice guide
Monolithic frameincluded——from $140 / m²
Shell with facade and windowsincludedincluded—from $250 / m²
Ready for fit-out, with utilitiesincludedincludedincludedfrom $300 / m²
How the fixed price works

Full cycle

How does
construction go?

Every stage closes with a signed acceptance certificate and a deliverable that stays with you.

What we do

We shortlist 3–5 options to suit your brief, budget and future logistics. We assess the terrain, access, utilities and surroundings.

Deliverable
Comparison table
Schedule
2–4 weeks

What we do

We verify ownership, encumbrances, zoning, utilities and development parameters. We obtain registry extracts and planning conditions.

Deliverable
Report and risk map
Schedule
3 working days
Check a plot

What we do

We prepare the architectural concept, working drawings and engineering solutions. This is where the detailed estimate is produced.

Deliverable
Complete design package
Schedule
2–3 months

What we do

We compile the document package, submit it to City Hall and manage the approvals until the permit is issued.

Deliverable
Building permit
Schedule
1–3 months

What we do

Monolithic frame, building envelope, facade and building services. Weekly reports and stage-by-stage acceptance. Duration depends on the project: private house 8–14 months, warehouse 6–12, residential building 12–20.

Deliverable
Building ready for fit-out
Schedule
6–20 months

What we do

We prepare the as-built documentation, carry out the final acceptance and hand over the keys.

Deliverable
Keys and documents
Schedule
2 weeks

Questions

In short
the essentials

How much does a warehouse cost per m²?

The 2026 guide: monolithic frame from $140 / m², ready for fit-out with utilities from $300. Height, spans, floor loading and the utilities package drive the cost; the exact figure comes after the working design.

How long does a warehouse or workshop take?

From 6 to 12 months. Every stage has its date in the contract, and the building is handed over ready for equipment: floors, ramps, power, ventilation and treatment systems.

Can the first phase open while the second is built?

Yes, phased commissioning is the normal mode for production and warehouses. The first phase runs and earns while the second is being built next to it.

Who arranges the utility connections?

We handle the connections ourselves: power, water, ventilation and treatment are part of the design, not a separate invoice at the end. We also help with commissioning.

Our commitment

Will the price change
during construction?

We fix
the full scope

The complete estimate, handover date, scope of works, materials and specific brands.

We back it
with resources

Our own plant, formwork and crews. Direct supply and a detailed design before we start.

Changes —
transparent

If the brief changes, we price only the difference and agree it before work begins.

How the fixed price works

Next step

Get an estimate
for your project

Tell us the area, the plot and the date you want — we come back with the scope of works and a price range by stage.

+995 599 538 277WhatsApp · Telegram

  1. 01Brief
  2. 02Design
  3. 03Estimate
  4. 04Lock-in

Two fields — and we'll get back to you within one working hour

By clicking the button you agree to our privacy policy.

Get an estimate