Plant
Tower cranes, concrete pumps, excavators, vehicle fleet.
About us
ONEZA Construction is a general contractor with its own plant, formwork, crews and technical department. That is why we can stand behind the price and the schedule.
The company has worked in Georgia for 12 years: monolithic residential buildings from 1 000 m², production sites and warehouses, private houses from 160 m². The price and the deadline are fixed in the contract before the work starts; payment is 100% of the materials and 15% of the work up front, then against the acts of accepted stages; the structural warranty is 10 years. ONEZA does not carry out finishing works: the building is handed over ready for fit-out with a full set of documents.

Founder Giorgi Onezashvili on site in Krtsanisi · 15.09.2026
History
We started with private houses; today we build residential blocks and industrial complexes across Georgia.
We do not assemble a new team for every project. Our concrete crews, engineers and procurement staff have worked together for years, so we know our output and our costs precisely.
Building now
Photos from the active ONEZA Construction site in Krtsanisi, Tbilisi, September 2026: the building's monolithic frame, reinforcement and concreting of a floor slab.




Philosophy
ONEZA Construction builds in reinforced concrete for clients who need a predictable outcome: a building that outlives its owner, and a project where the price and the deadline are known in advance. The monolithic frame is chosen not for the technology itself, but for Georgia's seismic conditions, open layouts and the durability of the building.
The client receives an asset, not a construction site: a building ready for fit-out, with documents, a 10-year structural warranty and a clear cost base.
The estimate and the schedule are ready before machinery arrives and become an annex to the contract. The price does not change because of exchange rates, materials or the contractor's own mistakes.
Our own crews, formwork and machinery instead of assembled subcontracts: we know our own output, so the schedule holds.
Every stage is closed with an acceptance act signed with the supervising engineer, and only then does payment fall due. Photos and video from the site arrive weekly.
Resources
Our own resources are the reason we can fix the price and the schedule.
Tower cranes, concrete pumps, excavators, vehicle fleet.
Our own formwork stock for 6 000 m² of slabs at a time.
120 staff on payroll: concrete workers, steel fixers, engineers.
Designers, estimators, technical supervisors and land lawyers.
Responsibility
Roles are split so that design, site, schedule and supply each stay under separate control.
A single point of responsibility for decisions, schedule and communication.
Checking structural solutions and critical stages on site.
Tying together architecture, structure, building services and the estimate.
Delivery planning, specification control and incoming inspection of materials.
Team
Six heads of departments: every part of the work, from the contract to the handover, has a person in charge you can reach directly.

Founder and Chief Executive Officer
Signs the contract and answers to the client for price and deadline.
18 years in construction

Project Director
Single point of contact: schedule, decisions, weekly reports.
12 years in construction

Chief Structural Engineer
Seismic design, the concrete frame and rebar inspection before every pour.
15 years in construction

Concrete Works Site Manager
Formwork, reinforcement and pouring — on site every day.
14 years in construction

Chief Architect
Concept and working design within the plot's parameters and K-1/K-2.
11 years in construction

Technical Supervision Engineer
Inspects critical stages and signs them off with the client.
10 years in construction
Company details
The contract, the warranty and the acceptance acts are signed by a company registered in Georgia.
Oversight
The process is open to the client: decisions, deadlines, certificates and estimate changes arrive in the project's shared chat without asking a manager.
We design and build to the current building codes of Georgia.
An independent engineer inspects every critical stage.
Each stage is signed off with the client's representative.
Photos and video from the site every week.
Reports, acceptance certificates and the estimate — in the project's shared WhatsApp or Telegram chat.
Questions about the company
12 years. In that time the company moved from private houses to residential buildings and production sites, while the structure stayed the same — monolithic reinforced concrete.
Ourselves. The company has its own machinery, its own formwork, concrete and rebar crews on the payroll and its own technical department. That is why the pace of work does not depend on someone else's schedule.
10 years on the structure. This is a clause in the contract, not a verbal promise: next to it the price, the completion date and the penalty for our own delay are fixed.
The advance is 100% of the cost of materials and 15% of the cost of the work. Materials are bought for the whole scope at once, so their price is fixed; the remaining 85% of the work is paid against the acts of accepted stages.
No. ONEZA hands the project over ready for fit-out — with the shell, the roof, the facade, the windows and the utilities. Fit-out works are ordered separately.
Next step
First we review your brief. Then we propose the scope of works, a realistic schedule and how the price will be calculated.
+995 599 538 277WhatsApp · Telegram