Three lines of work.
One full cycle.

ONEZA Construction builds three types of monolithic buildings in Tbilisi: residential buildings from 1,000 m² in 12–20 months, warehouses and workshops from 1,000 m² in 6–12 months, private houses from 160 m² in 8–14 months. Foundations and retaining walls can be ordered as a separate stage. 2026 guide: frame from $140 / m², ready for fit-out with utilities from $300 / m².

The cycle is the same in every direction: land check, design and estimate, permit, construction and handover ready for fit-out. The price and the deadline are fixed in the contract after design; payment is 100% of the materials and 15% of the work up front, then against the acts of accepted stages; the structural warranty is 10 years. ONEZA does not carry out finishing works.

Comparison

How do the directions
differ?

DirectionFloor areaFloors and heightCompletion stageSchedule
Residential buildingsfrom 1,000 m²up to 20 storeysReady for fit-out, with utilities and facade12–20 months depending on scale
Industrial and warehousesfrom 1,000 m²up to 14 m, crane railsEquipment-ready: floors, utilities, loading ramps6–12 months
Private housesfrom 160 m²1–3 storeys, basementReady for fit-out: shell, roof, windows, facade, building services8–14 months

What is included

What does the full cycle
include?

We do not do interior finishing — we hand over the building ready for fit-out with a complete set of documents.

What we do

We shortlist 3–5 options to suit your brief, budget and future logistics. We assess the terrain, access, utilities and surroundings.

Deliverable
Comparison table
Schedule
2–4 weeks

What we do

We verify ownership, encumbrances, zoning, utilities and development parameters. We obtain registry extracts and planning conditions.

Deliverable
Report and risk map
Schedule
3 working days
Check a plot

What we do

We prepare the architectural concept, working drawings and engineering solutions. This is where the detailed estimate is produced.

Deliverable
Complete design package
Schedule
2–3 months

What we do

We compile the document package, submit it to City Hall and manage the approvals until the permit is issued.

Deliverable
Building permit
Schedule
1–3 months

What we do

Monolithic frame, building envelope, facade and building services. Weekly reports and stage-by-stage acceptance. Duration depends on the project: private house 8–14 months, warehouse 6–12, residential building 12–20.

Deliverable
Building ready for fit-out
Schedule
6–20 months

What we do

We prepare the as-built documentation, carry out the final acceptance and hand over the keys.

Deliverable
Keys and documents
Schedule
2 weeks

Questions

Which service
fits you?

What does ONEZA Construction build?

Three lines: residential buildings from 5,000 m², industrial and warehouse facilities from 2,000 m², private houses from 160 m². Retaining walls and foundations as a separate stage.

Can I order just a foundation or a retaining wall?

Yes, monolithic works are taken on as a separate stage. ONEZA quotes the scope and price after a site visit and fixes them in the contract.

How long does construction take for each line?

A private house takes 8–14 months, a warehouse 6–12, a residential building 12–20. The timeline is written into the contract before work begins.

Does ONEZA do interior finishing?

No. The building is handed over ready for fit-out: frame, shell, roof, windows, facade and utilities.

Next step

Get an estimate
for your project

Not sure which of our services fits? Describe the project — we will say what suits it and price it.

+995 599 538 277WhatsApp · Telegram

  1. 01Brief
  2. 02Design
  3. 03Estimate
  4. 04Lock-in

Two fields — and we'll get back to you within one working hour

By clicking the button you agree to our privacy policy.

Get an estimate