ONEZAconstruction

For investors and developers

Residential
and apartment buildings

ONEZA Construction builds monolithic residential buildings and apart-complexes in Tbilisi from 1,000 m² and up to 20 floors in 12–20 months. 2026 guide: monolithic frame from $140 / m², ready for fit-out with utilities from $300 / m². The completion date and the price are fixed in the contract, with the contractor liable for them.

ONEZA splits a large residential complex into phases so that sales can start earlier. The building is handed over ready for fit-out — with the facade, utilities, parking and a full set of documents for commissioning. Payment: 100% of the materials and 15% of the work up front, then against the acts of accepted stages; structural warranty — 10 years. We calculate the economics of the project as early as the choice of the plot.

Your challenge

What happens
if construction misses the deadline?

The problem

Missed deadlines break the financial model: loan interest mounts, sales are postponed, buyers lose confidence.

The ONEZA answer

The handover date and price are fixed in the contract, with the contractor held liable. Our own plant and crews keep the pace without depending on subcontractors.

Specifics

Which residential buildings
does ONEZA build?

Format
Residential buildings, aparthotel complexes, multi-phase housing developments
Floor area
from 1,000 m²
Storeys
up to 20 storeys
Structure
Monolithic reinforced concrete frame
Completion stage
Ready for fit-out, with utilities and facade
Schedule
12–20 months depending on scale

What makes this segment different

What do we consider
in a residential building project?

Financial model

We help you run the project economics as early as site selection.

Phases

We split large developments into phases so sales can start sooner.

Parking

Underground and surface parking included in the design.

Documents

A complete package for commissioning and registration.

Price

How much does
a residential building cost per m²?

Indicative 2026 prices for Tbilisi: materials and labour included, design and permits excluded. The exact price is fixed in the contract after the design stage.

StageFrameFacade and windowsUtilitiesPrice guide
Monolithic frameincluded——from $140 / m²
Shell with facade and windowsincludedincluded—from $250 / m²
Ready for fit-out, with utilitiesincludedincludedincludedfrom $300 / m²
How the fixed price works

Full cycle

How does
construction go?

Every stage closes with a signed acceptance certificate and a deliverable that stays with you.

What we do

We shortlist 3–5 options to suit your brief, budget and future logistics. We assess the terrain, access, utilities and surroundings.

Deliverable
Comparison table
Schedule
2–4 weeks

What we do

We verify ownership, encumbrances, zoning, utilities and development parameters. We obtain registry extracts and planning conditions.

Deliverable
Report and risk map
Schedule
3 working days
Check a plot

What we do

We prepare the architectural concept, working drawings and engineering solutions. This is where the detailed estimate is produced.

Deliverable
Complete design package
Schedule
2–3 months

What we do

We compile the document package, submit it to City Hall and manage the approvals until the permit is issued.

Deliverable
Building permit
Schedule
1–3 months

What we do

Monolithic frame, building envelope, facade and building services. Weekly reports and stage-by-stage acceptance. Duration depends on the project: private house 8–14 months, warehouse 6–12, residential building 12–20.

Deliverable
Building ready for fit-out
Schedule
6–20 months

What we do

We prepare the as-built documentation, carry out the final acceptance and hand over the keys.

Deliverable
Keys and documents
Schedule
2 weeks

Questions

In short
the essentials

How much does it cost to build a residential building in Tbilisi?

The 2026 guide: monolithic frame from $140 / m², shell with facade and windows from $250, ready for fit-out with utilities from $300. The exact sum is calculated from the working design and fixed in the contract before machinery reaches the site.

How long does a residential building take?

From 12 to 20 months depending on volume and height. The date is tied to the stage schedule that drives the payments, so any slippage shows up at the next acceptance act, not at the end of the build.

Can the scheme be built in phases?

Yes. A large scheme is split into phases so the first one starts earning while the second is still being built. If that matters to your model, the phasing is planned at the design stage.

Who handles the building permit?

We do. We check the build coefficients and the zoning conditions, prepare the document package, file it with the City Hall and see the approval through. It usually takes one to three months.

Our commitment

Will the price change
during construction?

We fix
the full scope

The complete estimate, handover date, scope of works, materials and specific brands.

We back it
with resources

Our own plant, formwork and crews. Direct supply and a detailed design before we start.

Changes —
transparent

If the brief changes, we price only the difference and agree it before work begins.

How the fixed price works

Next step

Get an estimate
for your project

Tell us the area, the plot and the date you want — we come back with the scope of works and a price range by stage.

+995 599 538 277WhatsApp · Telegram

  1. 01Brief
  2. 02Design
  3. 03Estimate
  4. 04Lock-in

Two fields — and we'll get back to you within one working hour

By clicking the button you agree to our privacy policy.

Get an estimate