Layout
Open spans and replanning without altering load-bearing structures.
Article · Technology
The frame is cast in reinforced concrete right on site. This gives freedom of layout, a structure that resists earthquakes as one whole, and a predictable pace, provided the formwork and crews are your contractor's own.
·
In short
Columns, shear walls and slabs are poured on site, in formwork around a rebar cage.
The result is a single spatial structure with no joints between elements. Walls between columns are filled with block or brick and carry no load, so the layout can change without touching the structure.
Georgia is a seismically active region. A monolithic frame designed to current codes resists seismic loads with the whole structure.
Advantages
Open spans and replanning without altering load-bearing structures.
A single structure designed for seismic loads to Georgian codes.
One technology for a two-storey house and a twenty-storey building.
With our own formwork, every slab takes a predictable number of days.
Quality
The quality of a monolithic frame is built on site, in every pour.
The structural engineer designs the frame for the loads, soils and seismicity of the plot.
Before each pour an engineer accepts the rebar: diameters, spacing, concrete cover.
Class as designed, slump control and test samples for strength.
Concrete gains strength on schedule; formwork is never stripped early.
An act signed with the technical supervisor before the next floor begins.
Questions
It depends on the building. In multi-storey buildings a monolithic frame often wins on pace and open layouts; for a private house the design estimate shows the difference.
Gradually. Stripping and loading follow the schedule in the method statement, adjusted for the weather.
Yes, with concrete heating and anti-freeze admixtures. This is built into the estimate in advance.
Articles
Agricultural or not: can you build, who may own the plot, and how the category is changed.
ReadPlotThree numbers from the building conditions that decide the floor area and height of a building. With a sample calculation.
ReadPriceFive reasons estimates grow during construction, and what to fix in the contract before work starts.
ReadFor foreignersWhich land a foreigner may buy, whether you need to travel, how a power of attorney works and what to check before the deal.
ReadFor foreignersHow the money reaches the site: transfers and bank compliance, payment against stage acts and acceptance without travelling.
ReadNext step
First we review your brief. Then we propose the scope of works, a realistic schedule and how the price will be calculated.