ONEZAconstruction

Article · Price

Why estimates grow
and how to stop it

Estimates grow not because of inflation but because they were calculated from a sketch. We go through five reasons and what the contract must contain so the price does not change.

·

In short

A sketch estimate
is only a guess

Most estimates on the market are made before the design: by area and price per square metre.

Such a figure is fine for a first conversation, not for a contract. Quantities of concrete, rebar, earthworks and utilities are known only from the working design.

Anything not counted before the start is added during construction, at the client's expense.

Causes

Five sources
of estimate growth

Each of them is removed before work starts, not during construction.

  1. 01

    No working design

    Quantities are guessed, and the difference shows up on site.

  2. 02

    Geology not checked

    Weak soil or groundwater changes the foundation, the most expensive part of the frame.

  3. 03

    No material grades

    “Concrete” instead of a specific class lets a contractor swap the material or rewrite the price.

  4. 04

    Price tied to the market

    The contract allows recalculation when rebar, concrete or exchange rates go up.

  5. 05

    Changes without an addendum

    The client asks for small things and at the end gets one bill for all of them.

Contract

What to fix
before the start

Estimate
An annex to the contract with quantities and prices for every type of work
Specifications
Concrete, rebar, windows, facade, with specific grades
Price
Firm, with no recalculation for exchange rates or price rises
Changes
Only by addendum and before work starts
Payment
In stages, after the acceptance act is signed
Responsibility
Penalties for delays caused by the contractor
How we fix the price

Questions

In short
the essentials

How do I get an accurate estimate?

Through a working design: its estimate becomes an annex to the contract. We quote the cost of design at the first meeting.

Why are others cheaper?

Often because utilities, the facade or earthworks were left out of the figure. Compare estimates for the same scope of work.

What if I want to change the design myself?

We price only the difference, sign an addendum, and only then start the work.

Next step

Get an estimate
that will not change

First we review your brief. Then we propose the scope of works, a realistic schedule and how the price will be calculated.

+995 599 538 277WhatsApp · Telegram

  1. 01Brief
  2. 02Design
  3. 03Estimate
  4. 04Lock-in

Two fields — and we'll get back to you within one working hour

By clicking the button you agree to our privacy policy.

Get an estimate