Industrial building · 2024
Gldani
Concept visual · to be replaced with a photo of the project
6 100m²
floor area
floor area
9months
of construction
of construction
2024year
handed over
handed over
About the project
Key facts
Industrial building with crane runways and a separate power unit. Phased commissioning allowed the production line to start ahead of schedule.
- Type
- Industrial building
- Floor area
- 6 100 m²
- Location
- Tbilisi
- Storeys
- 2 storeys
- Construction period
- 9 months
- Year of handover
- 2024
- Completion stage
- Ready for fit-out
- Contract price
- Unchanged
Visual direction
The look of the project
This is a concept visual for the page layout, not a photo of the completed project.
Concept
Progress
Stages
and timeline
- 01Legal due diligence — 1 week
- 02Design — 2 months
- 03Frame and slabs — 4 months
- 04Building services — 2 months
- 05Handover — 2 weeks
Next step
Discuss
a similar project
Tell us what you want to build — we will find a project close in type and area and price yours.
+995 599 538 277WhatsApp · Telegram
- 01Brief
- 02Design
- 03Estimate
- 04Lock-in